Explainer
IBM Maximo runs maintenance and asset work for a large share of asset heavy organisations. This explainer covers what the Maximo Application Suite contains, how AppPoints licensing works, where the 7.6 support deadline stands and what moving involves.
By Christopher Fagan, Managing Partner, PEF Consulting Partners
Delivered for and alongside
















For years IBM Maximo meant Maximo Asset Management 7.6, a single application installed on an organisation’s own servers. Today it means the Maximo Application Suite, usually shortened to MAS, a set of applications sharing one licence pool and one platform.
The applications buyers meet most often are these:
Around them sit Mobile, Scheduler, Schedule Optimizer, Reliability Strategies, Inventory Optimisation, Real Estate and Facilities, and IT. IBM announced MAS 9.1 as generally available on 25 June 2025, adding Maximo Assistant, a generative AI chat assistant built on watsonx.ai, together with Asset Investment Planning for comparing investment scenarios.
MAS runs on Red Hat OpenShift. IBM sells it as SaaS hosted on AWS or as client managed software for your own data centre or a hyperscaler, and says OpenShift, Db2 and WAS Liberty are included at no extra purchase cost when used within the suite.
MAS is licensed in AppPoints, a pool of credits that users and installed components draw on. IBM’s MAS 9.1 licensing document sets out the user types:
Concurrent use is measured at the peak number of people signed in at once. Authorised entitlements belong to one named person and can only be moved by permanent transfer. Administrator points are reserved permanently.
Installed components also draw on the pool for as long as the environment exists. The connectors for SAP, Oracle or Workday cost 80 AppPoints each, Visual Inspection 45, Spatial 20 and the full Optimizer 220. Development and test installs do not consume points where a matching production install exists. The AI service is metered in tokens, with roughly one billion tokens a month equal to 10 AppPoints.
The practical consequence is that sizing MAS is a modelling job. Shift patterns, the mix of heavy and occasional users, and which integrations you run all move the number, and a wrong assumption either wastes money or leaves engineers locked out at peak.
IBM publishes more than many enterprise vendors, but only for its smallest SaaS packages, and in US dollars. Checked in November 2026, the Essentials SaaS plans start under 40,000 US dollars a year for Maintenance and under 47,000 US dollars a year for Inspection, with starting allocations of 150 and 175 AppPoints respectively. Space Management, Capital Planning, Lease Management and Inventory Optimisation each start under 40,000 US dollars a year.
Standard and Premium SaaS plans are quoted. Client managed software is priced through IBM’s estimator or a quote. Subscriptions carry a minimum twelve month, non cancellable term, paid for the full commitment.
What drives the quote is the AppPoints total, the deployment choice, any industry solutions and add ons, and the term. Partner services for implementation, hosting and support are priced separately and can easily outweigh the first year licence. Ask for the licence model and the services estimate together so you can see the whole picture.
IBM ended regular base support for Maximo Asset Management 7.6.1.x on 30 September 2025. Customers could buy one year of extended support, which an IBM community notice dated to 30 September 2026, and IBM offers up to five years of sustained support beyond that.
Eligibility is not automatic. IBM’s support page says customers must be current on subscription and support, be on 7.6.1.3 or later, and show they are preparing a Maximo upgrade roadmap. Read exactly what sustained support covers before treating it as a plan rather than a bridge.
So as of November 2026, any organisation still on 7.6 is past the end of extended support. That is a security and audit question as much as a technical one, and it is worth putting in front of the board with a dated decision rather than leaving it with the maintenance systems team.
Maximo makes most sense for organisations with large, regulated or safety critical asset bases, complex work management, and the appetite to use condition and reliability data. Water, energy networks, transport, defence and heavy manufacturing are its natural territory. For a single factory or a facilities team, it is usually more platform than the job needs, and a lighter tool from our CMMS software guide will be easier to run.
IBM sells and delivers Maximo largely through partners. Its Partner Plus directory lists firms with tiers such as Gold and with resale authorisations, offering implementation, upgrades, hosting and application support. IBM states that those listings are supplied by the companies and not validated by IBM, so do your own checks: named consultants, recent MAS references in your sector, and who actually holds the hosting and support obligations.
Running the procurement of every software provider on the National Grid separation taught me to test the integrator as hard as the product. With Maximo that matters doubly, because the partner often becomes your hosting provider and support desk for years.
Going from 7.6 to MAS is a replatforming, not a patch. Expect to work through:
Some organisations use the deadline to test the market instead. IFS Cloud, Oracle Fusion Cloud Maintenance and SAP are the usual alternatives, and our EAM software selection service compares them for asset owners, with the utility angle covered on our utilities asset management systems page.
Our bench includes consultants who have taken part in and analysed decisions made before, during and after platform migrations, which is the experience a Maximo decision calls for. Fees are shown plainly on our pricing page.
Related reading: EAM software selection, CMMS software buyer’s guide, Utilities asset management systems, ServiceMax explained, National Grid separation case study.
IBM Maximo is enterprise asset management software. It records assets and their hierarchy, plans and tracks maintenance work, manages spare parts, purchasing and contracts, and in the Application Suite adds condition monitoring, asset health scoring, failure prediction and AI visual inspection. It is used mostly by utilities, transport, energy, defence and heavy industry organisations with large asset bases.
AppPoints are the licence credits for the Maximo Application Suite. Users draw points by type: in the MAS 9.1 licensing document a concurrent Limited user is 5, Base 10 and Premium 15, while authorised users are 2, 3 and 5. Installed components such as the SAP, Oracle or Workday connectors also consume points, at 80 each.
IBM ended base support for Maximo Asset Management 7.6.1.x on 30 September 2025. One year of extended support was available to 30 September 2026, and IBM offers up to five years of sustained support for eligible customers who are current on subscription, on 7.6.1.3 or later, and working to an upgrade roadmap.
IBM publishes prices only for its Essentials SaaS packages, in US dollars: Maintenance starts under 40,000 US dollars a year and Inspection under 47,000 US dollars a year, as checked in November 2026. Standard, Premium and client managed options are quoted. Subscriptions run for at least twelve months, and partner implementation and hosting costs come on top.
For large asset owners the usual alternatives are IFS Cloud, Oracle Fusion Cloud Maintenance and SAP, each strongest where the organisation already runs that vendor’s finance and supply chain. For smaller maintenance operations, a CMMS such as Fiix, MaintainX or Limble may cover the need at much lower cost and effort.
Still on Maximo 7.6, or weighing up MAS? Talk to us about your licence position, your partner options and whether an upgrade or a market test makes more sense for you.
Book a confidential conversation
Independent, client side help on the systems around ERP and CRM: LIMS selection, MES selection, eQMS selection, Computer system validation, HRIS selection and implementation, Payroll implementation, Workday HCM, SAP SuccessFactors, Oracle HCM, Procurement software selection, EAM software selection, WMS selection, Power BI consultancy, and ERP implementation itself. For our fees see pricing.
Written by Christopher Fagan
Managing Partner, PEF Consulting Partners
Christopher has led systems and transformation delivery for 19 years, including the National Grid separation, the £9bn Energy Bills Support Scheme and the BP Pulse EV charging rollout.