Sector guide
A housing management system now has to prove compliance as well as collect rent. With Awaab’s Law widening on 30 November 2026 and tenant satisfaction data under scrutiny, here is what to look for, who sells it and how to buy well.
By Christopher Fagan, Managing Partner, PEF Consulting Partners
Delivered for and alongside
















A housing management system is the operational core of a social landlord. It holds the record of every home, every tenancy and every resident, and runs the processes that hang off them. The modules vary by vendor, but a complete system typically covers:
Some landlords run all of this in one product. Others pair a core housing system with a specialist repairs scheduler, asset database or CRM. Both models work. What does not work is the common middle ground where a dozen systems hold overlapping versions of the same property and resident data, and nobody can say which is right. That is the problem the current regulatory regime exposes most sharply.
Awaab’s Law came into force for the social rented sector on 27 October 2025, covering all emergency hazards and damp and mould that presents a significant risk of harm. From 30 November 2026 it extends to excess cold, excess heat, falls, structural collapse, fire and explosions, electrical hazards and domestic hygiene. A third phase, without a date yet, will bring in the remaining hazards under the Housing Health and Safety Rating System except overcrowding.
The timescales are precise. Emergency hazards must be investigated and made safe within 24 hours. Significant hazards must be investigated within 10 working days, with a written summary to the tenant within 3 working days of the investigation concluding and safety work completed within 5 working days of it concluding. The government’s guidance stresses record keeping: every report, every access attempt, every communication and the date each written summary was issued.
That translates directly into system requirements. Your housing management system needs to identify a potential hazard wherever it is reported, whether by a tenant, a repairs operative or a surveyor, and start the right clock. It needs to count working days, not calendar days, pause or record correctly when access is refused, and alert someone before a deadline passes. It needs to produce the written summary and keep the evidence in one case history.
Many current systems can be configured to do this, and vendors such as NEC publish material on using existing tools. The question is whether your configuration, your workflows and your staff actually do it, consistently, across repairs, housing and the contact centre. Test it with real cases before the next phase widens the scope again.
The Regulator of Social Housing’s Tenant Satisfaction Measures are 22 indicators: 12 from tenant perception surveys and 10 from management information. Landlords owning 1,000 or more homes must submit them. The regulator published its 2025/26 headline report on 5 November 2026, covering 356 submissions. Median overall satisfaction among general needs and supported housing tenants rose to 74 per cent from 72 per cent the year before, 83 per cent of non emergency repairs were completed within target, and 86 per cent of stage one complaints were answered within the Housing Ombudsman’s Complaint Handling Code timescales.
Those management information measures, covering repairs, complaints, antisocial behaviour and building safety checks, come straight out of your systems. If the repairs module records completion when the operative leaves rather than when the job is actually finished, or complaints are logged in a separate tool with different categories, the published figure will be wrong and the regulator can ask how it was produced.
The Safety and Quality Standard, in force since 1 April 2024, goes further. It requires registered providers to have an accurate, up to date and evidenced understanding of the condition of their homes, and to use data from across their records on stock condition. In other words, the asset data is now a regulatory record, not a planning aid.
When you assess a housing management system, ask each vendor to walk through how every one of the 10 management information measures is calculated in their product, from which fields, with what audit trail. The answers vary more than you might expect.
There are other suppliers, and some landlords build on general platforms such as Dynamics or Salesforce with housing specific extensions. Those can work well but put more of the design burden on you. Whichever route you take, check the vendor’s roadmap for Awaab’s Law phase three and for any future changes to the measures.
The housing system rarely holds the general ledger. Most landlords run finance in Unit4, Access, Microsoft Dynamics or similar, and the interface between the two decides whether rent and repairs costs reconcile at month end.
The flows to design are: rent debits, receipts and arrears summarised from the rent accounts into the ledger; housing benefit and Universal Credit payments matched to tenant accounts; contractor invoices for repairs and planned works raised against work orders and costed to the right property, component and budget; service charge income and expenditure by scheme; and capital spend on components for the asset register. If you are replacing finance at the same time, our Unit4 consultancy team can help sequence the two.
CRM is the other decision. Civica Cx and MRI include CRM capabilities within the housing product. Some larger landlords prefer a separate CRM as the single front door for residents, linked to the housing system for tenancy and repairs data. That gives a better contact centre experience but adds an integration that must stay in step with every housing system upgrade. Weigh it honestly; our CRM implementation service starts with exactly that question.
Repairs scheduling, mobile working and contractor portals are the third cluster. If your housing system’s repairs module is weak, a specialist scheduler may be the answer, and our guide to field service management software covers that market.
A housing system replacement is shaped more by data than by software. The property hierarchy is the usual starting point: estates, blocks, homes, rooms and components, each with a reference that other systems depend on. If that hierarchy differs between the housing system, the asset database and the finance system, compliance reporting will never be reliable.
Resident data is the second. Awaab’s Law guidance tells landlords to keep accurate information about residents and their homes, including vulnerabilities that change how urgently a hazard should be treated. That information is often in free text notes or in a separate case system, and it needs structure before it can drive prioritisation.
The third is history. Decide what to migrate in full, what to summarise and what to archive in a readable form. Open repairs, live arrears cases, current antisocial behaviour cases and compliance certificates must move cleanly. Ten years of closed repairs probably do not need to. Our data migration specialists start with a profile of what you actually hold, which almost always turns up surprises.
Start the data work before you procure. It improves your requirements, shortens implementation, and gives you a cleaner Tenant Satisfaction Measures return whichever system you end up with.
Councils must buy under the Procurement Act 2023, which has been in force since 24 February 2025, and housing associations should take their own advice on how public procurement rules apply to them. Frameworks are commonly used, but a framework does not do the evaluation for you.
Build the specification around outcomes and evidence rather than feature lists: how each Awaab’s Law clock is started, paused and reported; how each management information measure is calculated; how a repair moves from report to invoice; how a tenancy is created from an allocation. Ask vendors to demonstrate these on scripted scenarios using your data, and score what you see, not what is promised.
Visit reference landlords of similar size and stock type, and ask them what they would configure differently. Check the contract for data export rights, hosting location, upgrade obligations and how regulatory changes are funded.
Accountability for public money runs through my own track record; I was Project Director on the £9bn Energy Bills Support Scheme for Ofgem, BEIS and HMRC, where every pound had to reach the right place and be evidenced. Our team also includes consultants who have led and analysed system decisions before, during and after migrations. We have no commercial relationship with any housing software supplier, and our fees are published plainly on our pricing page.
Related reading: Field service management software, CMMS software explained, Document management systems, Best CRM for UK organisations, What goes wrong in data migration.
A housing management system is the core software used by housing associations and councils to manage homes, tenancies and residents. It typically covers rents and arrears, repairs, asset and compliance data, allocations and lettings, antisocial behaviour, complaints, leasehold service charges and resident portals. It feeds the finance system and produces much of the data behind regulatory returns such as the Tenant Satisfaction Measures.
Social landlords must investigate significant hazards within 10 working days, send the tenant a written summary within 3 working days of the investigation concluding, and make emergency hazards safe within 24 hours. Systems need to identify hazards from any report, track working day deadlines, record access attempts and communications, and alert staff before deadlines pass. The scope widens to more hazards on 30 November 2026.
The main suppliers are NEC Software Solutions with NEC Housing, Civica with Cx, MRI Software with products including MRI Housing One, and Aareon with QL, HomeMaster and ActiveH Web. Some landlords also build on general platforms such as Dynamics or Salesforce with housing extensions. Shortlist on fit with your stock, regulatory reporting and finance integration rather than market share claims.
Registered providers that own 1,000 or more homes must submit Tenant Satisfaction Measures to the Regulator of Social Housing each year. There are 22 measures: 12 from tenant perception surveys and 10 from management information covering repairs, complaints, antisocial behaviour and building safety. The regulator’s 2025/26 headline report, covering 356 submissions, was published on 5 November 2026.
It depends on scope, data quality and how many surrounding systems change at the same time. Aareon, for example, says a typical HomeMaster implementation takes about seven months. Procurement under the Procurement Act 2023 adds time before that for councils. Starting data cleansing and process design before procurement is the most reliable way to shorten the overall programme.
Can your housing system prove compliance today? Talk to me about your current systems, data and procurement timetable and I will tell you honestly where the risks sit.
Book a confidential conversation
Independent, client side help on the systems around ERP and CRM: LIMS selection, MES selection, eQMS selection, Computer system validation, HRIS selection and implementation, Payroll implementation, Workday HCM, SAP SuccessFactors, Oracle HCM, Procurement software selection, EAM software selection, WMS selection, Power BI consultancy, and ERP implementation itself. For our fees see pricing.
Written by Christopher Fagan
Managing Partner, PEF Consulting Partners
Christopher has led systems and transformation delivery for 19 years, including the National Grid separation, the £9bn Energy Bills Support Scheme and the BP Pulse EV charging rollout.
Where next